RP2U

Repositori Publikasi Penelitian Universitas Syiah Kuala

Data Publikasi Seminar Belum Ada!!

1. TIME-COST TRADE-OFF MODEL FOR TIE BEAM ACTIVITY. https://doi.org/10.24815/jts.v7i1.91632018
2. The End User Requirement for Project Management Software Accuracy. http://doi.org/10.11591/ijece.v8i2.pp1112-11212018
3. Identifying inaccuracy of MS Project using system analysis. https://doi.org/10.1088/1757-899X/352/1/0120362018
4. Negative Total Float to Improve a Multi-Objective Integer Non-Linear Programming for Project Scheduling Compression. http://www.iaescore.com/journals/index.php/IJECE/article/view/12235/02018
5. Comparative Study on the Cost of Building Public House Construction Using Red Brick and Interlock Brick Building Material in the City of Banda Aceh. https://doi.org/10.1088/1757-899X/352/1/0120412018
6. Estimating the normal duration using normal Production Rate per Day (PRPD) of project activity. https://doi.org/10.1051/matecconf/201819710004 2018
7. Neural Network for the Standard Unit Price of the Building Area . https://doi.org/10.1016/j.proeng.2017.01.3362017
8. The Weights Detection of Multi-criteria by Using Solver. http://dx.doi.org/10.11591/ijece.v7i2.pp858-8682017
9. THE SUBCONTRACTOR SELECTION PRACTICE USING ANN-MULTILAYER . https://doi.org/10.14716/ijtech.v8i4.94902017
10. Study of Unit Price for Competitive Bidding Based on CCI (Construction Cost Index) for Building . http://dx.doi.org/10.17577/IJERTV5IS0104992016
11. Aplikasi Software Winest Terhadap Perhitungan Rencana Anggaran Biaya (Studi Kasus Pembuatan Jaringan Irigasi Meudang Ara kecamatan Syamtalira Bayu Kabupaten Aceh Utara). 2015
12. Strategi Penentuan Alternatif Pembiayaan Proyek Real Estate. 2004

Data Publikasi Paten Belum Ada!!