RP2U

Repositori Publikasi Penelitian Universitas Syiah Kuala

Data Publikasi Seminar Belum Ada!!

Data Publikasi Buku Belum Ada!!

1. The implementation of unit price of work standard SNI 7394: 2008 for the construction of reinforced concrete beam. http://iopscience.iop.org/article/10.1088/1757-899X/352/1/0120272018
2. External risk factors affecting construction costs. https://doi.org/10.1063/1.50116312017
3. RISIKO EKSTERNAL PADA PELAKSANA PROYEK KONSTRUKSI DI PROVINSI ACEH. http://konteks.id/arsip/konteks-10/2016
4. KAJIAN PRODUKTIVITAS PADA PEKERJAAAN PENUTUP ATAP. http://www.rp2u.unsyiah.ac.id2015
5. Project Irrigation Efficiency Assesment on Paddy Field of Pandrah Irrigation Project, Aceh. http://qir.eng.ui.ac.id/wp-content/uploads/2016/08/Qir-Proceeding-2015.pdf2015
6. Housing Rehabilatation Budget Estimate Due To Earthquake Disaster By Using Multiple Linear Regression Models. http://www.rp2u.unsyiah.ac.id2014
7. MODEL ESTIMASI ANGGARAN BIAYA REHABILITASI RUMAH TINGGAL AKIBAT BENCANA GEMPA BUMI. http://konteks.id/arsip/konteks-8/2014
8. CAUSES OF OVERHEAD COSTS OVERRUN IN BUILDING PROJECT IN BANDA ACEH. http://www.rp2u.unsyiah.ac.id2013
9. COST OPTIMIZATION OF ROAD CONSTRUCTION PROJECT USING VALUE ENGINEERING JOB PLAN (Case Study of Road Construction Project Package JNB1, District of West Aceh). http://www.rp2u.unsyiah.ac.id2013
10. KRITERIA PENILAIAN KINERJA SUBKONTRAKTOR MENURUT PERSPEKTIF KONTRAKTOR. http://www.rp2u.unsyiah.ac.id2013
11. Factors Causing Rework at Building Construction in the Department of Highways and Settlements of Aceh Province . http://jurnal.unsyiah.ac.id/AICS-SciEng/article/view/18562012

Data Publikasi Paten Belum Ada!!