RP2U

Repositori Publikasi Penelitian Universitas Syiah Kuala

Data Publikasi Seminar Belum Ada!!

1. Factors Influencing Cost Overruns in Construction Projects in Banda Aceh, Indonesia. http://www.ijmas.org/5-8/IJMAS-5706-2018.pdf2018
2. Uncertainty Variables on Cost Estimation in Project Construction. http://www.iosrjournals.org/iosr-jbm/papers/Vol20-issue1/Version-1/K2001018086.pdf2018
3. ANALISIS PENGARUH FAKTOR-FAKTOR KOMPETENSI PROJECT MANAGER TERHADAP KEBERHASILAN PROYEK KONSTRUKSI SUNGAI PADA DINAS PENGAIRAN ACEH. http://www.jurnal.unsyiah.ac.id/JTS/article/view/98472017
4. ANALISIS FAKTOR-FAKTOR PEMBENGKAKAN BIAYA (COST OVERRUN) YANG BERPENGARUH TERHADAP KETIDAKPASTIAN BIAYA (CONTINGENCY COST) PADA PROYEK IRIGASI DI KABUPATEN ACEH BESAR. http://www.jurnal.unsyiah.ac.id/JTS/article/view/99092017
5. PEMBINAAN STASIUN KERJA YANG ERGONOMIS BAGI PEKERJA KERAJINAN SOUVENIR ACEH DI KOTA BANDA ACEH. https://journal.unnes.ac.id/nju/index.php/abdimas/article/view/11231/71072017
6. ANALISIS FAKTOR-FAKTOR PENGARUH KONFLIK (DISPUTE) TERHADAP KEBERHASILAN PROYEK KONSTRUKSI DI PROVINSI ACEH. http://jurnal.unsyiah.ac.id/JTS/article/view/88032017
7. Implementation of Quality Management System in Construction. http://www.ajer.org/papers/v6(12)/ZA0612173179.pdf2017
8. THE EFFECT OF THE RISK FACTORS ON THE PERFORMANCE OF CONTRACTORS IN BANDA ACEH, INDONESIA. http://www.arpnjournals.org/jeas/research_papers/rp_2016/jeas_0816_4792.pdf2016
9. Identification and Assessment of Risk Factors Affecting Construction Projects in North Aceh, Indonesia. http://www.iosrjournals.org/iosr-jbm/papers/Vol18-issue9/Version-4/K1809047277.pdf2016
10. Analysis of Causes of Delay and Time Performance in Construction Projects. http://www.iosrjournals.org/iosr-jmce/papers/vol13-issue5/Version-3/R130503116121.pdf2016
11. Causes of Conflicts and Disputes in Construction Projects. http://www.iosrjournals.org/iosr-jmce/papers/vol13-issue5/Version-6/F1305064448.pdf2016
12. Cost Overruns and Failure in Construction Projects. http://www.iosrjournals.org/iosr-jbm/papers/Vol18-issue10/Version-5/K1810058083.pdf2016
13. ANALISIS FAKTOR-FAKTOR PENGHAMBAT YANG BERPENGARUH TERHADAP WAKTU PROYEK IRIGASI DI PROVINSI ACEH. http://www.jurnal.unsyiah.ac.id/JTS/article/view/92792016
14. The Influence of Uncertainty Variables on Cost Estimation Lesson Learned From Construction Industry in Indonesia. http://ajbasweb.com/old/ajbas/2015/April/380-385.pdf2015
15. The Impact of Uncertainty Variableson Contingency Cost. http://ajbasweb.com/old/ajbas/2015/April/279-283.pdf2015
16. The Influence of Uncertainty Variables of project time in Construction Industry In Banda Aceh, Indonesia. http://ajbasweb.com/old/ajbas/2015/September/304-307.pdf2015
17. The Correlation of Uncertainty Variables on Project Time Estimation in Banda Aceh, Indonesia. http://ajbasweb.com/old/ajbas/2015/September/308-311.pdf2015
18. Frequency Analysis of Genesis Risk In Construction Projects. http://www.iosrjournals.org/iosr-jmce/papers/vol5-issue6/H0564551.pdf?id=24542013
19. Analysis of Direct Budget Implementation Building Construction Work. http://www.iosrjournals.org/iosr-jmce/papers/vol4-issue4/F0444348.pdf?id=25212012
20. Telaah Anggaran Biaya Langsung Pelaksanaan Pekerjaan Pembangunan Gedung SLTP Lamlagang. 2010

Data Publikasi Proseding Belum Ada!!

Data Publikasi Paten Belum Ada!!